Interactive Gantt Control VARCHART XGantt .NET, how to upgrade from v5.1 to v5.2?

VARCHART XGantt is an interactive Gantt chart control, and its modular design allows you to create applications that meet your and your customers needs. (Our leading Gantt controls VARCHART XGantt can be used in .NET, ActiveX and ASP.NET applications.) In addition, also has a stable and reliable Gantt chart tool, before writing the first line of code, you We can know whether to meet customer needs.

VARCHART XGantt has released v5.2 version, this article focuses on the project to upgrade from .NET VARCHART XGantt 5.1 Dao seven steps VARCHART XGantt .NET 5.2, and look at the specific operating it ~

1, before installing VARCHART XGantt.NET 5.2, please use the form XGantt 5.1 Open Visual Studio Form Designer, and by clicking General on the property page Export to save the current XGantt Configure button.

48.png

2, close the form, and then close Visual Studio.

3, installation VARCHART XGantt .NET 5.2.

4, open the project in Visual Studio again, delete the references in the Solution Explorer NETRONIC XGantt (still refers XGantt 5.1) and insert the new reference NETRONIC XGantt, must refer to VARCHART XGantt 5.2.

5, using a form containing XGantt open form designer. The following error message appears:

49.png

6, click " Ignore and continue ." Form Designer form will again display correctly, but XGantt will revert to the default configuration.

7, now, by clicking on the " General " "on the property page Import " button to import previously saved configuration.

50.png

XGantt now use your personal configuration again.

The end of the matter content of the article, interested friends can click to download the latest version of VARCHART XGantt try oh ~


Guess you like

Origin blog.51cto.com/14467432/2438770