相对于1998的计划,2008的计划进行了分层,分为主测计划和不同级别的计划
IEEE829-2008中的主测试计划
The Master Test Plan (template)
1. Introduction
1.1. Document identifier
1.2. Scope
1.3. References
1.4. System overview and key features
1.5. Test overview
1.5.1 Organization
1.5.2 Master test schedule
1.5.3 Integrity level schema
1.5.4 Resources summary
1.5.5 Responsibilities
1.5.6 Tools, techniques, methods, and metrics
2. Details of the Master Test Plan
2.1. Test processes including definition of test levels
2.1.1 Process: Management
2.1.2 Process: Acquisition
2.1.3 Process: Supply
2.1.4 Process: Development
2.1.4.1 Activity: Concept
2.1.4.2 Activity: Requirements
2.1.4.3 Activity: Design
2.1.4.4 Activity: Implementation
2.1.4.5 Activity: Test
2.1.4.6 Activity: Installation/checkout
2.1.5 Process: Operation
2.1.6 Process: Maintenance
2.1.6.1 Activity: Maintenance test
2.2. Test documentation requirements
2.3. Test administration requirements
2.4. Test reporting requirements
3. General
3.1. Glossary
3.2. Document change procedures and history
IEEE829-2008中的不同级别的计划
The Level Test Plan (template)
1. Introduction
1.1. Document identifier
1.2. Scope
1.3. References
1.4. Level in the overall sequence
1.5. Test classes and overall test conditions
2. Details for this level of test plan
2.1 Test items and their identifiers
2.2 Test Traceability Matrix
2.3 Features to be tested
2.4 Features not to be tested
2.5 Approach
2.6 Item pass/fail criteria
2.7 Suspension criteria and resumption requirements
2.8 Test deliverables
3. Test management
3.1 Planned activities and tasks; test progression
3.2 Environment/infrastructure
3.3 Responsibilities and authority
3.4 Interfaces among the parties involved
3.5 Resources and their allocation
3.6 Training
3.7 Schedules, estimates, and costs
3.8 Risk(s) and contingency(s)
4. General
4.1 Quality assurance procedures
4.2 Metrics
4.3 Test coverage
4.4 Glossary
4.5 Document change procedures and history
连接:https://www.cnblogs.com/wintersun/p/4983215.html