CCC certification process and factory inspection review

CCC certification process
Insert picture description here

Stage 1: Application acceptance

After receiving the application that meets the requirements, CQC will issue a notice of acceptance to the applicant to notify the applicant to send or post relevant documents and materials. The application phase becomes 1.

At the same time, CQC sends relevant charges and notices.

The applicant shall provide the information to CQC as required.

After the applicant has paid, please fill in the payment voucher as required.

Stage 2: Document review

In the data review stage, the product certification engineer needs to divide the application unit.
Insert picture description here

After the unit is divided, if sample testing is required, the product certification engineer sends a sample delivery notice and corresponding payment notice to the applicant, and at the same time, informs the applicant to send a sample acceptance notice to the corresponding testing agency.

Phase 3: Receipt of samples sent

The sample shall be sent directly to the designated testing agency by the applicant.

After the applicant has paid, please fill in the payment voucher as required.

The testing agency shall check and accept the samples received by the call, fill in the sample acceptance report, and issue a sample rectification notice for unqualified samples, and fill in the sample acceptance report after rectification.

After the sample is checked and accepted, the testing organization fills in the sample testing schedule and submits it to CQC.

After receiving the progress of sample testing, CQC will issue a formal acceptance notice to the applicant after confirming that the applicant’s relevant fees have been paid, and the testing agency will issue a testing task letter, and the sample testing will officially begin.
Insert picture description here

Phase 4: Sample test

During the sample test, the applicant should make corrections in accordance with the sample test correction notice for non-conformance items.

After the sample test is over, the testing agency will fill in the sample test result notification.

The testing agency also sends test reports and other data to CQC.

Stage 5: Factory inspection

For applications that require factory inspection, the inspection office organizes factory inspection.
Insert picture description here

Stage 6: Conformity assessment

The product certification engineer collects and sorts out the results of each stage before making a preliminary evaluation.

The qualified assessor shall re-evaluate the above results.

Stage 7: Certificate approval

Director issues certificate

Stage 8: Printing, receiving, sending and managing certificates

The applicant prints out the certificate receipt, picks it up or requests to send the certificate.