The mortar construction in Linyi external wall insulation construction is the key adhesion effect, which is important. Jiangyuan Construction Group Co., Ltd. summarizes a few points based on long-term construction experience, hoping to help you understand the construction process of external wall insulation mortar.
First, grassroots treatment. First of all, before the whole construction project, everyone must first clean up the dust, oil stains and other dirt on the wall. In addition, the expansion mold on the surface of the external wall should be flattened, and then the lower part should be filled with a layered method with standard cement mortar.
Linyi External Wall Insulation Mortar Construction Jiangyuan Construction
Second, the holes in the outer wall should be tightly blocked. Then use the interface agent on the concrete base surface to take the relevant rough surface treatment. For the construction process of external wall insulation mortar. The base layer should be watered and moist, but during the plastering construction, there should be no open water on the wall.
Third, mortar mixing. For the insulation mortar mixing process used in the external wall, mechanical mixing that meets the standards and requirements should be selected. Usually different types of mortars have different mixing times. Generally keep it for about 5-6 minutes. Such raw materials are used as they are mixed and used up as much as possible within 3 hours.
Fourth, attention should be paid to painting and calendering procedures. Before the construction of the external wall insulation mortar, the mortar cake should be made according to the design thickness of the insulation layer. Only after it fully meets the strength requirements, the external wall insulation mortar can be applied. And such external wall insulation mortar construction must adopt a layered construction method.
Fifth, the construction conditions are also a more noteworthy issue in the construction process of external wall insulation mortar. First, after the brackets and embedded parts are installed in accordance with the specified design. The relevant construction environment temperature should not exceed the specified range of 35℃, and there should be no phenomenon of construction under 5℃. In addition, the external wall construction has very strict requirements for wind speed. It cannot be constructed on or before rainy days, and rain protection measures must be taken.
Sixth, in addition to the points mentioned above, the relevant personnel should also prepare the tools and equipment required for the construction of the external wall insulation mortar, and check whether these equipment and tools are faulty or abnormal before use phenomenon. Only safe and effective equipment and tools can help such construction projects to be completed smoothly.
Editor's summary: Linyi external wall insulation mortar construction, Jiangyuan Construction Group Co., Ltd. introduced these points, and more attention should be paid to the construction process of the construction personnel to achieve more efficient results.
From exterior wall insulation construction, professional real estate service provider, Jiangyuan Construction Group Co., Ltd.