Data test sites:
1. Property measurement precision control plane: final control points substantially adjacent points in error is less than 2.5cm ;
2. Property plane control point comprises two, three, four , etc., one, two, three stages. Property horizontal control points should be embedded and fixed signs.
3.
Property measurement