Daily Scrum: 2012/11/28

 

member Character today's work Tomorrow Plan
Wang Enron PM, Dev Sorry I got nothing dry today. . Proceed with the preparation of ProfileManager class (304)
Boxwood PM, Dev, Art  EnemyCraft completed part of the interface type (310) Proceed EnemyCraft part of the interface class (310), if completed, a subclass Craft establish visual (335) 
Xie Yan Bo Dev  Implement (303) to write storage class  Complete and test the storage (303)
Liu Junwei Test  Busy professionals selected job.  Connect the last test
Gu Qian Art, Test  Selection of games dubbing  Selection of games dubbing
Tan Zhuanqi Dev, QA  Time is limited, unable to complete the 306 direct enemy    Design of the aircraft and complete a straight line path 306
Lin Lu Art, QA  Logic design interface  Improved interface logic
Xie Yongqing Dev  Logic of the laser sighting is completed (305) Bullets started writing subclasses (missiles, bombs) are (317, 318)

Burndown follows:

Reproduced in: https: //www.cnblogs.com/buaashine/archive/2012/11/28/2793320.html

Guess you like

Origin blog.csdn.net/weixin_34259159/article/details/94548452