A. The overall schedule
main mission | planning time |
---|---|
Project Selection | Week Seven |
demand analysis | Eighth Week |
Arrange the division of labor | Week Nine |
Specific written | Tenth, eleven, twelve weeks |
Optimize the sound | Week 13 |
II. Division team
Module name | specific contents |
---|---|
log in Register | User login and register |
Personal information | After the user logs in this interface can see your information, and set a nickname such as Avatar |
Setting module | Set app interface background, eye mode, night mode, font size, etc. |
Task sector | Regional task released, updating and processing tasks completed tasks |
Each member of the division of labor details
member | Division of work | |
---|---|---|
Zhang Zeyu | Product manager | |
Li Zhiheng | Product manager | |
Huang Hao | Prototype, UI | |
Sun Tingxin | Prototype, UI | |
Xiao Shen Hong | front end | |
Liu Weinan | Front-end (captain) | |
Cai Jiayi | front end | |
Jiang Sijiang | rear end | |
Yang Lan Yu | rear end | |
Lin Yi Feng | rear end |
todolist
position | To Do |
---|---|
Product manager | Analysis of different user demand for software, and expressed to the prototype at |
Prototyping | According to product manager required to design beautiful and friendly interface, improve the function of ui |
front end | Log in to complete the registration module, search module, three modules front end module developed personal information |
rear end | Complete back-end development, interface design, server processing |
Burndown
III. Mind Mapping
IV. Team members contribution ratio
principal | task | The proportion of the workload |
---|---|---|
Liu Weinan | Reply speech | 15% |
Sun Tingxin | Write a blog | 5% |
Xiao Shen Hong | PPT production and evaluation table | 10% |
Li Zhiheng | PPT production and evaluation table | 10% |
Jiang Sijiang | Draw UML diagrams | 8% |
Cai Jiayi | Draw UML diagrams | 8% |
Cai Jiayi | Write a needs analysis | 8% |
Sun Tingxin | Prototyping | 10% |
Huang Hao | Prototyping | 8%。 |
Lin Yi Feng | Problems with record score | 8% |
Zhang Zeyu | ppt and review tables making | 10% |
V. Review Form Design
Six .UML
Class Diagram
State diagram
Entity Relationship Diagram
VII. Tool Selection
FIG StarUML produced using mind, FIG embodiment, activity diagram, a state diagram, a class diagram; FIG ER produced using WPS, burn FIG.
VIII. Evaluation of Tools
Convenient and beautiful, in a short time can be a good idea represented graphically
IX. Respondent summary
X. Requirements Specification
Https://pnkbadukcom/s/l-we8YjzW-ui30-mHz0sD3Q
k2r0
XI. Difficulties encountered and solutions
Description difficult
In order to determine the appropriate style of the early members have different ideas also have their own advantages and disadvantages difficult to unify. Panel members for the use of tools is not skilled
which try to make
in order to select the best ui, each member completed several simple interface voted in the group. Each spent a lot of time self-learning tool
Is resolved
Yes
What harvest
Hello, everyone is really good
to enhance cooperation and team members learn from each other
Twelve .PSP
Personal SoftwareProcess Stages | 预估耗时(分钟) | 实际耗时(分钟) | |
---|---|---|---|
Planning | 计划 | 45 | 50 |
·Estimate | ·估计这个任务需要多少时间 | 30 | 40 |
Development | 开发 | 100 | 50 |
·Analysis | · 需求分析 (包括学习新技术) | 70 | 80 |
·Design Spec | · 生成设计文档 | 30 | 20 |
·Design Review | ·设计复审 | 30 | 10 |
·Coding Standard | · 代码规范 (为目前的开发制定合适的规范) | 30 | 45 |
·Design | · 具体设计 | 260 | 300 |
·Coding | · 具体编码 | 30 | 40 |
·Code Review | · 代码复审 | 0 | 0 |
·Test | · 测试(自我测试,修改代码,提交修改 | 0 | 0 |
Reporting | 报告 | 60 | 50 |
·Test Repor | ·测试报告 | 30 | 50 |
·Size Measurement | ·计算工作量 | 15 | 20 |
· Postmortem & Process Improvement Plan | ·事后总结, 并提出过程改进计划 | 80 | 60 |
· 合计 | 810 | 815 |
十三.学习进度条
第N周 | 新增代码(行) | 累计代码(行) | 本周学习耗时(小时) |
---|---|---|---|
1 | 200 | 200 | 10 |