10 groups may Aipi Pi Alpha team sprint blog directory

 Alpha sprint blog directory 

A, Scrum Meeting

1. [sixth week of meetings]

2. [Week Seven Minutes]

Second, the test report [Alpha stage test report]  

Only partially completed project basis, failed to complete implementation, the project can not run the test

Third, the acquisition of soft engineering principles / methods / skills?

  1. The team management: project management through github, assigning control tasks to individuals through the process of issue;

  2. Team to ensure adequate communication; regular no doubt is a good choice, discussion groups speak in exchange is a good way

  3. Stable team membership is smooth cooperation, to complete the basic objectives; to play the code together two people can really speed up efficiency, but can not achieve the effect of 1 + 1 = 2

  4. Members of varying ability, some students are familiar with such software development, but some students do not have experience, we must consider the ability to assign specific tasks students;

  5. Gradually mastered HTML, css or back-end application or database development skills;

  6. Feasibility considerations: Even some of those who need more functionality, higher voice is also going to verify the technical feasibility, with limited energy situation for the existence of a technical problem and not be shelved dedication here. By contrast, even if some functions are not raised a lot of people, but as a core function ought to be achieved, we should try to go to achieve it. (Core functionality> Demand function> Low feasibility of demand).