Team Name: 007
Leader blog:
https://www.cnblogs.com/Linrrui/p/11884375.html
Job blog:
https://edu.cnblogs.com/campus/fzu/SE_FZU_1917_K/homework/9941
Crew case
Lin Rui (Leader)
- Over the past two days to complete the task which
- The fourth meeting of the Organization
- Acceptance alpha (3/6) results
- Finishing this blog
- github record check
- The next plan
- Continue to follow up alpha (4/6) progress
- Adjust the progress of the project team (two weeks preparing for the exam)
- Improve communication team
- Which left the task
- Burndown
- Burndown
- Difficulties encountered
graphics exam preparation, as well as the next test, too hard this semester - What have you learned and questions
exam too many do not know how to arrange the
Zhang Yan
- Over the past two days to complete the task which
- Completed items search auto-refresh
- github check recorded
in the shared group
- The next plan
- Complete community
- Which left the task
- FIG burn
the group shared
- FIG burn
- Difficulties encountered
do not know how to achieve when entering text changes, automatic refresh search results. Solution: Use TextChangedListener monitor changes in the text, which the callback afterTextChanged () method to refresh the results. - What have we learned and questions
learned how to listen for changes in the text entry box
Kun Yao Bin
- Over the past two days to complete the task which
- Api community to complete the docking
- github check recorded
in the shared group
- The next plan
- Continue to complete the community
- Which left the task
- FIG burn
the group shared
- FIG burn
- Difficulties encountered
when using Retrofit library, only thread of the call network requests, and update the UI must be carried out in the main thread, do not know how to thread switching. Solution: Create a sub-thread with new Thread (), after a network request returns, use runOnUiThread () method to switch back to the main thread - What have we learned and questions
to switch on the threads have a preliminary understanding
Zhu
- Over the past two days to complete the task which
- Item Details page to complete the docking api
- github check recorded
in the shared group
- The next plan
- Post Posted continue to complete the community page
- Which left the task
- FIG burn
the group shared
- FIG burn
- Difficulties encountered
switching threads to make the code nested layers, readability is poor, often forget to switch threads. Solution: Use RxJava responds programming, to simplify the code thread switching - What have we learned and questions
have a preliminary understanding of the reactive programming
Chen Guanhong
- Over the past two days to complete the task which
- For pop button item of my administration interface of the telephone
- Completed the layout of a few buttons for item
- github check recorded
in the shared group
- The next plan
- Ready to click on the item detail screen to jump to finish
- Which left the task
- FIG burn
the group shared
- FIG burn
- What difficulties have
encountered some not familiar with the controls in the realization of pop, the size of the control is not too good - What have we learned and questions
learned to achieve popups, no doubt
Wu Jiemin
- Over the past two days to complete the task which
- For complete details of some of the layout of the interface
- github check recorded
in the shared group
- The next plan
- Help art front-end sit
- Which left the task
- FIG burn
the group shared
- FIG burn
- Difficulties encountered
for the use of controls or the use of recycleview not familiar with the layout of - What have we learned and questions
learned how to use most of the controls
Wang Jinghong
- Over the past two days to complete the task which
- UI interface design completed "Community" module
- Jump to page buttons and other details have been redesigned
- github check recorded
in the shared group
- The next plan
- Within two days to continue to improve optimization "community" module
- Which left the task
- FIG burn
the group shared
- FIG burn
- Difficulties encountered
some interface was re-designed to be unreasonable perfect - What have you learned and doubt
No doubt
Caiya Jing
- Over the past two days to complete the task which
- Help test code
- Prepare for a test
- github check recorded
in the shared group
- The next plan
- Organizational arrangements to complete the task
- Review Engine
- Which left the task
- FIG burn
the group shared
- FIG burn
- Difficulties encountered
ddl exam and a variety of jobs - What have you learned and questions
Harvest time is schedule management efficiency is improved; No doubt
Zhouxin Huang
- Over the past two days to complete the task which
- Further improve the user's credit score module
- Cupping massage to zhgg
- github check recorded
in the shared group
- The next plan
- Items management module development to proceed, leased
- Which left the task
- FIG burn
the group shared
- FIG burn
- What difficulties have
still not familiar with the back-end, the slow progress - What have we learned and questions
the harvest is gradually mastered springboot, doubt zhgg Why so strong?
Chen Zhanhong
- Over the past two days to complete the task which
- Write community module code
- Establish posts
- Posts
- Thumbs Posts
- Search Keyword ...
- github check recorded
in the shared group
- The next plan
- Before all the modules making up for deficiencies
- Which left the task
- FIG burn
the group shared
- FIG burn
- Difficulties encountered
at present nothing difficult, might consider the next step to optimize performance and logging - What have you learned and questions
the use of the framework of a more skilled
Dengze Yuan
- Over the past two days to complete the task which
- For supplemental community features, personal management module posts
- Chuibei bottled water to ZHGG
- github check recorded
in the shared group
- The next plan
- Partition module
- Which left the task
- FIG burn
the group shared
- FIG burn
- Difficulties encountered
mathematical modeling IC + + + search engine software engineering practice = 4 ddl, 3 days
days is not angry with me DZY, such as modeling eternal night? Pen! - What have we learned and questions
resisting ability to enhance, ZHGG Why so strong?
Showcase the latest achievements within the group
Standup photo
Meeting time-consuming record
N-meeting | Consuming (minutes) |
---|---|
1 | 8 |
2 | 7 |
3 | 5 |
4 | 7 |
Personal PSP
PSP2.1 | Personal Software Process Stages | Estimated time consuming (hours) |
The actual time-consuming (hours) |
---|---|---|---|
Planning | plan | 0 | 0 |
· Estimate | • Estimate how much time this task requires | 1.5 | 2 |
Development | Develop | 0 | 0 |
· Analysis | · Needs analysis (including learning new technologies) | 0.9 | 1.4 |
· Design | Generate design documents | 0 | 0 |
· Design Review | · Design Review | 0 | 0 |
· Coding Standard | · Code specifications (development or select the appropriate specifications for the current development) | 0 | 0 |
· Design | · Specific design | 0 | 0 |
· Coding | · Specific coding | 0 | 0 |
· Code Review | · Code Review | 0 | 0 |
· Test | · Test (self-test, modify the code, submit modifications) | 0 | 0 |
Reporting | report | 0 | 0 |
· Test Report | · testing report | 0 | 0 |
· Size Measurement | · Computing workload | 0.1 | 0.1 |
· Postmortem & Process Improvement Plan | · Hindsight, and propose improvement plan | 0.5 | 0.5 |
· Total | 1.5 | 2 |
Individual learning progress bar
N-Week | New Code (lines) | Cumulative codes (lines) | This week learning time-consuming (hours) | Cumulative learning time-consuming (hours) | Important growth |
---|---|---|---|---|---|
1 | 0 | 0 | 12 | 12 | A basic understanding of the design and implementation of a prototype map, mastered the basic usage of blade |
2 | 412 | 412 | 20 | 32 | Algorithm concept, basic frame |
3 | 660 | 1072 | 36 | 68 | Algorithm Improvement |
4 | 148 | 1220 | 15 | 83 | Learn to use interface, learn github Use |
5 | 0 | 1220 | 15 | 98 | Clear the team project topics |
6 | 0 | 1220 | 15 | 113 | Defined the project team needs |
7 | 0 | 1220 | 3 | 118 | To help find the data you need, then we have to study hard technology |
8 | 0 | 1220 | 3 | 121 | Re-arrange the division of labor, inspection team alpha (3/6) results in alpha stage |