beta sprint - Friday

table of Contents

1.  Team Information

2.  SCRUM part

3.  PM Report

Owned courses

https://edu.cnblogs.com/campus/xnsy/SoftwareEngineeringClass1/homework

Work requirements

https://edu.cnblogs.com/campus/xnsy/SoftwareEngineeringClass1/homework/3346

Team Name

Mystery

1. Team Information

·  Team Name: Mystery

·  Team information:

Zhang Qi

201 731 062 320 (Leader)

Luo Penglei

201731062332

Xiao Yao

201731062331

Liu Qi

201731062310

Wu Yu Jin

201731062303

Wang Jie

201731062114

2.SCRUM part

2.1. Members case

 

· 201 731 062 320 (Zhang Qi)

Today Progress

Database modification, there may be insufficient to ensure basic operation. Requirements have been modified to a minimum standard, only you need to configure a database.

There is a problem

Temporarily no problem

   Tomorrow arrangements

 After the next two days to prepare the defense of acceptance.

· 201 731 062 332 (Luo Penglei)

Progress Today

All algorithms will be tested to achieve maximum efficiency.

There is a problem

Limited level, perhaps the algorithm can be further improved.

Tomorrow arrangements

To communicate with his teammates, making acceptance PPT . .

 

 

201 731 062 331 (Xiao Lei)

Progress Today

 Go into the details to communicate with his teammates to know whether code is abnormal, and the corresponding documents, planning schedules, making burndown.

There is a problem

Sometimes temporary schedule wrong, it should be more rapid correction.

Tomorrow arrangements

Ensure that the code works well , to prevent abnormal .

.

· 201 731 062 310 (Liu Qi)

Development today

The code continues to unit testing, troubleshooting codes without exception.

There is a problem

No big problem, the case with the conditions of all operating normally.

Tomorrow arrangements

   Summarizes the test.

 

· 201 731 062 303 (Wu Yu Jin)

Progress Today

Use feel and efficiency of software testing repeatedly, I made a last modification, to determine the interface framework, to maintain the aesthetics of the professional software.

There is a problem

Taking into account professional software, did not do too much modification, I do not know is correct.

Tomorrow arrangements

To communicate with his teammates, making acceptance ppt

 

· 201 731 062 114 (Wang Jie)

Progress Today

Design examples to test the software, and the captain completed the optimization of the database together .

There is a problem

Examples of acceptable design.

Tomorrow arrangements  

With the players ready to cope with possible exception of code together.

2.2.SCRUM Conference Photos

Because the computer handling inconvenient and difficult to find sites large enough to accommodate the members, so the use of QQ group meetings and processes telephone network exchange.

 

 

3.PM report

3.1. Burndown

3.2. The date of contribution ratio

结合teambition以及小组成员个人进度汇报、花费时间,最终贡献比为下表

队员学号

队员昵称

贡献占比

201731062320(组长)

张棋

19%

201731062332

罗鹏磊

17%

201731062331

肖磊

16%

201731062310

刘琪

16%

201731062303

吴雨锦

15%

201731062114

王杰

17%

 

PM总结

今日工作顺利完成,由于课程较少,成员在队长的督促下早起,一起投入任务中。虽然有一些必然的缺陷,但我们的软件也完全可以胜任专业钻井探查工作和风险侦查工作。