table of Contents
1. Team Information
2. SCRUM part
3. PM Report
Owned courses |
https://edu.cnblogs.com/campus/xnsy/SoftwareEngineeringClass1/homework |
Work requirements |
https://edu.cnblogs.com/campus/xnsy/SoftwareEngineeringClass1/homework/3346 |
Team Name |
Mystery |
1. Team Information
· Team Name: Mystery
· Team information:
Zhang Qi |
201 731 062 320 (Leader) |
Luo Penglei |
201731062332 |
Xiao Yao |
201731062331 |
Liu Qi |
201731062310 |
Wu Yu Jin |
201731062303 |
Wang Jie |
201731062114 |
2.SCRUM part
2.1. Members case
· 201 731 062 320 (Zhang Qi)
Today Progress
Database modification, there may be insufficient to ensure basic operation. Requirements have been modified to a minimum standard, only you need to configure a database.
There is a problem
Temporarily no problem
Tomorrow arrangements
After the next two days to prepare the defense of acceptance.
· 201 731 062 332 (Luo Penglei)
Progress Today
All algorithms will be tested to achieve maximum efficiency.
There is a problem
Limited level, perhaps the algorithm can be further improved.
Tomorrow arrangements
To communicate with his teammates, making acceptance PPT . .
201 731 062 331 (Xiao Lei)
Progress Today
Go into the details to communicate with his teammates to know whether code is abnormal, and the corresponding documents, planning schedules, making burndown.
There is a problem
Sometimes temporary schedule wrong, it should be more rapid correction.
Tomorrow arrangements
Ensure that the code works well , to prevent abnormal .
.
· 201 731 062 310 (Liu Qi)
Development today
The code continues to unit testing, troubleshooting codes without exception.
There is a problem
No big problem, the case with the conditions of all operating normally.
Tomorrow arrangements
Summarizes the test.
· 201 731 062 303 (Wu Yu Jin)
Progress Today
Use feel and efficiency of software testing repeatedly, I made a last modification, to determine the interface framework, to maintain the aesthetics of the professional software.
There is a problem
Taking into account professional software, did not do too much modification, I do not know is correct.
Tomorrow arrangements
To communicate with his teammates, making acceptance ppt
· 201 731 062 114 (Wang Jie)
Progress Today
Design examples to test the software, and the captain completed the optimization of the database together .
There is a problem
Examples of acceptable design.
Tomorrow arrangements
With the players ready to cope with possible exception of code together.
2.2.SCRUM Conference Photos
Because the computer handling inconvenient and difficult to find sites large enough to accommodate the members, so the use of QQ group meetings and processes telephone network exchange.
3.PM report
3.1. Burndown
3.2. The date of contribution ratio
结合teambition以及小组成员个人进度汇报、花费时间,最终贡献比为下表
队员学号 |
队员昵称 |
贡献占比 |
201731062320(组长) |
张棋 |
19% |
201731062332 |
罗鹏磊 |
17% |
201731062331 |
肖磊 |
16% |
201731062310 |
刘琪 |
16% |
201731062303 |
吴雨锦 |
15% |
201731062114 |
王杰 |
17% |
PM总结:
今日工作顺利完成,由于课程较少,成员在队长的督促下早起,一起投入任务中。虽然有一些必然的缺陷,但我们的软件也完全可以胜任专业钻井探查工作和风险侦查工作。