Heacher Beta sprint (3/3)

Course Properties

Course work https://edu.cnblogs.com/campus/xnsy/SoftwareEngineeringClass1/
Job Link https://edu.cnblogs.com/campus/xnsy/SoftwareEngineeringClass1/homework/3353
Team Name Successful Wonder
Jobs goal Β version of the project complete, fully functional, interface.
project name Heacher support network

First, team members

 

Full name student ID blog address
Wang Junchen (Leader) 201731072323 https://www.cnblogs.com/jason5689/
Romero 201731062201 http://www.cnblogs.com/luomei/
吕登 name 201731062329 http://www.cnblogs.com/haveadate/
Chen Yulian 201731062205 https://www.cnblogs.com/youthlll/
Shen Ya Xin 201731062206 http://www.cnblogs.com/793181431q/

 

Two, SCRUM part

Wang Junchen

  • Progress Today
    • Auxiliary interface optimization, software testing accuracy, software engineering test.
  • There is a problem
    • We found some issues with feedback to improve
  • Tomorrow arrangements
    • Preparation of the defense dissemination of information
  • Screenshot day
    •  

Romero

  • Progress Today
    • Auxiliary optimized interface, test software correctness, robustness testing the code.
  • There is a problem
    • Yet found the problem.
  • Tomorrow arrangements
    • Dissemination of information to prepare a defense.

  • Screenshot day

吕登 name

  • Progress Today
    • Auxiliary optimized interface, test software correctness.
  • There is a problem
    • Yet found the problem.
  • Tomorrow arrangements
    • Dissemination of information to prepare a defense.

  • Screenshot day

Chen Yulian

  • Progress Today
    • Improve the layout of all interface, interface optimization end.

  • There is a problem
    • Interface layout more difficult, not easy to design.
  • Tomorrow arrangements
    • Dissemination of information to prepare a defense.

  • Screenshot day
  •  

Shen Ya Xin

  • Progress Today
    • Improve the layout of all interface, interface optimization end.

  • There is a problem
    • There is a problem, could not find a suitable background.

  • Tomorrow arrangements
    • Dissemination of information to prepare a defense.  
  • Screenshot day
    •  

SCRUM meetings Photo

 

 

 Team members through QQ voice way to sum up the Beta sprint for tomorrow's task was to arrange the division of labor.

And demonstrates the achievements of today, express their views.

Third, burndown

Today (6.14), burndown Heacher support network as follows:

 

 

Four, PM summary

此次Heacher互助平台项目,已经完成了初步拟定了所有计划,但是在Alpha测试后,通过很多同学的留言建议,发现了新的问题,需要优化更新,来让软件更加高效,更加人性化,功能更加丰富。

 

整个项目预期的任务量 (任务量 = 所有工作的预期时间): 90小时/人

目前已经花的时间 (所有记录的 ‘已经花费的时间’):95小时/人

还剩余的时间(所有工作的 ‘剩余时间’):0小时/人

 

同学们提出的问题(今日已经解决的后面已打勾✔) 15/15  已全部完成

 

明日计划任务:

1.准备答辩和发布

 

完整运行时截图

 

 

 

 

Guess you like

Origin www.cnblogs.com/jason5689/p/11024110.html